“When to stop testing” is a very interesting topic yet highly asked in many interviews these days. There are several answers to that question too such as: “you stop once you have completed an acceptance criteria”, some say “you never stop as testing is an ongoing task” and some day “it depends!”

Every company and every engineering team have their own criterias set in terms of when testing should be stopped for a particular product/feature. There are several things that impact this decision such as the entry and exit criterias too, however are these enough?

Let’s dive deeper and understand what is a good way to stop testing with enough confidence.

Table Of Contents

  • 1 When do we start testing?
  • 2 When to Stop Testing?
  • 3 Checklist
  • 4 Conclusion

When do we start testing?

When to STOP testing? (1)

Let’s start this blog by understanding when to really initiate your testing process. As we keep hearing a lot in communities, conferences, webinars, etc shift testing to the left and not to leave this major task later in the SDLC. The reason behind this is that it helps find defects earlier, clear any assumptions/ambiguities, reduces costs, time and effort to rework and retest on features. This then leads to a good quality product.

We can start testing as early as the requirements stage by understanding what is the ask from this feature:

  • What do we already have in place?
  • How much testing will be required?
  • If we don’t have anything in place, then what would the system expect?
  • Pair with developers and Business analysts to get a clear picture and expectations
  • Understand if we need other teams too as this might be a feature that impacts other teams or not
  • Be involved with the design team to understand the design prior to testing it
  • If you are automating tests, you can follow a TDD process too and won’t have to wait till the feature is fully developed

Once we are clear at this stage, deployment will become much smoother for the entire team.

When to Stop Testing?

Till date no manager/director has ever said to me or my team to stop testing or reduce testing. All I hear is are we ready to proceed, are we confident with the amount that has been tested? Generally testing is an ongoing task, we do tend to meet acceptance criterias and move our tasks to completion, however sometimes an extension or enhancement is done to the same feature, that means you have to test it again. Therefore having an open mind about this is always good for all teams.

The following points can be some guidelines to help you stop the testing tasks:

  • Decisions from your product owners, line managers to stop the testing tasks
    • a) Budget or/and resources were allocated to some other high priority project
    • b) The project was canceled (from the client’s side or the company’s side)
    • c) The allocated budget is over and no more budget is being allocated.
  • Deadlines that need to be met
  • No high priority and severity bugs found/expected
  • Completion of test case execution
  • Completion of functional and code coverage to a certain point
  • Completion of the acceptance criteria and exit criteria. It is imperative that we consider multiple factors while designing exit criteria, some of which are mentioned below:
    • 1. Strong buy-in from the software development team. In the end, your job is to discover defects and theirs is to fix.
    • 2. If there are clients who will further test the product, that should also be considered as to what will be an acceptable input quality.
  • Good coverage of the functionality/code.
  • Number of bugs in the feature or too buggy to deep dive (valid criteria for exiting a testing process is the discovery of a forecasted number of bugs).
  • Release deadline has been met

It is vital to pay attention to all finer details and errors in the product of the application. It is not possible to find all the bugs that may exist, but the team management will make decisions on when to release the product anyway. Also remember that if a bug is found in a live production environment that is not solely the testers responsibility, it’s the engineering team’s responsibility. Similarly, if you are retesting a vital bug and get asked “are we ready to release the testing?” it should not be the testers decision to say yes or no, it should always come from the management team. The release might go ahead with some unwanted bugs! See, we haven’t really stopped testing. The question is, can we find these bugs prior to the release, and what is their severity? And the best thing, how to stop the same bug from appearing?

Thereafter if you have met the exit criterias, ship it, but understand that it still has an unlimited amount of not yet discovered bugs.

Checklist

This checklist can serve as a guide to determine whether or not your team have enough confidence for completing the testing:

  • Stop the testing when deadlines like release deadlines or testing deadlines have reached.
  • Stop the testing when the test cases have been completed with some prescribed pass percentage.
  • Stop the testing when the testing budget comes to its end.
  • Stop the testing when the code coverage and functionality requirements come to the desired level.
  • Stop the testing when the bug rate drops below a prescribed level.
  • Stop the testing when the number of high severity Open Bugs is very low.
  • Stop the testing when the period of beta testing/alpha testing is over.

Some useful metrics you could also use :

  • Have a dashboard of the percentage of test cases that have passed.
  • Have a completion percentage based on the number of test cases executed.
  • Have a percentage of failed test cases.

One way to speed up your testing is when you automate your tests. Automation, though, should only be taken up if you see an ROI in the long run at least.

Here is a guide with in-depth discussions on do’s and don’ts of automated testing.

Check out the guide

Testsigma is one such tool that comes with features made specifically to help you speed up your testing. It is a codeless platform thus you don’t need to learn to code too. Learn more about it here: testsigma.com

Conclusion

Determining when to stop testing is subjective and a complex matter. I believe testing is a never-ending process in a positive way. I have yet to hear from someone that the software is 100% complete from testing. Criteria once designed are not meant to be carved in stone. It should be reviewed constantly in light of the adherence and the post-release issues which come after we meet a set criterion. Therefore, by exploring factors such as meeting release deadlines, the severity of bugs, management decisions, and establishing effective exit criteria, we have equipped you with the necessary thinking points to make informed choices. While the decision may still require careful consideration and evaluation of specific project circ*mstances, we are confident that the information shared in this blog will empower you to determine appropriate exit criteria and identify the right time to conclude testing. Remember, success lies in finding the right balance between thorough testing and project constraints.

Happy testing!

When to STOP testing? (2024)

FAQs

When should testing be stopped? ›

So, when to stop testing? Simple: when you fixed all Critical and Major defects. There are both software development and client relation reasons not to make the new version of your product more unstable than the previous one.

When would you stop testing? ›

Testing can be Stopped When:

The entire testing budget has been depleted. All testing-related documents and deliverables have been created, reviewed, and shared with the appropriate stakeholders. All the high-priority bugs must be resolved and the bug rate level comes at a low level.

When should I stop testing positive for Covid? ›

Key Takeaways. If you get COVID-19, you may continue to test positive even after you're feeling better. Some people who recover from COVID may test positive for weeks or even months after they were sick.

When should we start stop testing? ›

Stop the testing when the testing budget comes to its end. Stop the testing when the code coverage and functionality requirements come to the desired level. Stop the testing when the bug rate drops below a prescribed level. Stop the testing when the number of high severity Open Bugs is very low.

How do you determine when testing is done? ›

Common factors in deciding when to stop are:
  1. Deadlines (release deadlines, testing deadlines.)
  2. Test cases completed with certain percentages passed.
  3. Test budget depleted.
  4. Coverage of code/functionality/requirements reaches.
  5. A specified point.
  6. The rate at which bugs can be found is too small.
  7. Beta or Alpha Testing period ends.

When end to end testing? ›

End-to-end testing serves as the final checkpoint before a product's release, ensuring that every component of the application interacts correctly with others and that the system as a whole meets design and user requirements.

When to stop testing hCG levels? ›

After the pregnancy can be seen on ultrasound, doctors will probably stop measuring hCG altogether. At this point, "the best measure of a normally-growing pregnancy is the monitoring of uterine size by your provider," says Dr. Baldwin.

Should I keep taking pregnancy tests after a positive? ›

If you take a pregnancy test after you miss your period and the result is positive, that means you're pregnant. You can always take another test to be sure, if you want. You may want to go to a nurse or doctor, family planning clinic, or local Planned Parenthood Health Center to get a follow-up test.

How far into pregnancy do tests stop working? ›

Testing too late (after the first trimester) can also be an issue. "The hCG hormone still exists, but can become different components and may not be detected by your home pregnancy test," Dr. Lessman explains. "When there is a question, consider having a blood hCG test, which you can get at your doctor's office.

When am I no longer contagious with COVID? ›

After testing positive for COVID-19, the duration of contagiousness can vary. However, individuals are typically contagious for about 10 days after the onset of symptoms. For those with mild to moderate symptoms, this period can be shorter, often around 5-7 days.

Can I end isolation if I still test positive? ›

Ending isolation: You can end isolation after 5 days if you test negative (use an antigen test) on Day 5 or later – as long as you do not have a fever and your symptoms are getting better. If you still test positive on or after Day 5 or if you don't test, isolate for 10 full days, and until you don't have a fever.

Is it normal to still test positive for COVID after 10 days? ›

After a positive test result, you may continue to test positive for some time. Some tests, especially NAAT tests, may continue to show a positive result for up to 90 days. Reinfections can occur within 90 days, which can make it hard to know if a positive test indicates a new infection.

When should you test again when you have Covid? ›

If your antigen test (such as an at-home test) result is positive, you may still be infectious. Continue wearing a mask and wait at least one day before taking another test.

How much testing is sufficient or when to stop testing? ›

Some say to stop testing once you stop finding bugs. Others will suggest stopping when all the tests have been executed and passed. As we finish testing or feel like it's done, new test ideas can come up.

When should system testing be stopped? ›

When should you stop testing?
  1. When we run out of time.
  2. When the testers and/or the test environment are all re-deployed for another test.
  3. When the project budget runs out.
  4. When we have reached an acceptable level of risk.
  5. When all the defects have been found.

When should I stop testing for Covid after exposure? ›

Test right away. If your first test is negative, test again 1-2 days later. Even if you don't feel sick, test after exposure and again 3-5 days after last exposure. Test just before visiting individuals who are at higher risk for severe illness (older adults or people with weakened immunity).

When to stop testing interview questions? ›

There are a few criteria for ending testing:
  • The bug rate has fallen below an agreed-upon level.
  • The testing or release deadlines have arrived.
  • The testing budget is out of funds.
  • A certain percentage of test cases have passed.
  • The alpha or beta testing periods have ended.
Jul 23, 2024

When to stop testing is a very crucial decision, what factors should be considered for taking such a decision? ›

The most common factors that are taken into account when deciding when to stop testing are: Deadlines, e.g. release deadlines, testing deadlines; Percentage of test cases passed; Test budget and rate of spending (your burn rate and the amount of runway it affords you);

Top Articles
Meat substitutes: Resource demands and environmental footprints
Top 10 Best Buy-To-Let Areas In Sheffield | Track Capital
Napa Autocare Locator
Www.politicser.com Pepperboy News
Phone Number For Walmart Automotive Department
Comforting Nectar Bee Swarm
Sportsman Warehouse Cda
Beds From Rent-A-Center
Crime Scene Photos West Memphis Three
Dark Souls 2 Soft Cap
Seth Juszkiewicz Obituary
Aita Autism
Craigslist Cars Nwi
6th gen chevy camaro forumCamaro ZL1 Z28 SS LT Camaro forums, news, blog, reviews, wallpapers, pricing – Camaro5.com
The Shoppes At Zion Directory
Restaurants Near Paramount Theater Cedar Rapids
Swedestats
Caledonia - a simple love song to Scotland
EASYfelt Plafondeiland
Winco Employee Handbook 2022
Ac-15 Gungeon
Chime Ssi Payment 2023
Turbo Tenant Renter Login
Cb2 South Coast Plaza
At 25 Years, Understanding The Longevity Of Craigslist
Panolian Batesville Ms Obituaries 2022
No Limit Telegram Channel
208000 Yen To Usd
Table To Formula Calculator
Anesthesia Simstat Answers
Weather Underground Durham
Craigslist Sf Garage Sales
Grand Teton Pellet Stove Control Board
Ixl Lausd Northwest
Amici Pizza Los Alamitos
Louisville Volleyball Team Leaks
Reborn Rich Ep 12 Eng Sub
Dr Adj Redist Cadv Prin Amex Charge
The Thing About ‘Dateline’
Silive Obituary
התחבר/י או הירשם/הירשמי כדי לראות.
Exam With A Social Studies Section Crossword
Rocket Lab hiring Integration & Test Engineer I/II in Long Beach, CA | LinkedIn
Aznchikz
Used Auto Parts in Houston 77013 | LKQ Pick Your Part
15:30 Est
Rocket Bot Royale Unblocked Games 66
Coleman Funeral Home Olive Branch Ms Obituaries
Nfsd Web Portal
Buildapc Deals
라이키 유출
Lorcin 380 10 Round Clip
Latest Posts
Article information

Author: Pres. Carey Rath

Last Updated:

Views: 5759

Rating: 4 / 5 (41 voted)

Reviews: 80% of readers found this page helpful

Author information

Name: Pres. Carey Rath

Birthday: 1997-03-06

Address: 14955 Ledner Trail, East Rodrickfort, NE 85127-8369

Phone: +18682428114917

Job: National Technology Representative

Hobby: Sand art, Drama, Web surfing, Cycling, Brazilian jiu-jitsu, Leather crafting, Creative writing

Introduction: My name is Pres. Carey Rath, I am a faithful, funny, vast, joyous, lively, brave, glamorous person who loves writing and wants to share my knowledge and understanding with you.