VAV systems and return air balancing | Consulting - Specifying Engineer (2024)

When designing a variable air volume (VAV) system, engineers will specify return airflow volumes at the return air inlets. When these return air volumes are associated with variable supply air volumes for a given area, the ability to balance these return inlets requires some thought and evaluation.

The return inlet airflow values shown in Figure 1 are airflows required when the VAV boxes are at maximum cooling and the return fan is operating at maximum design airflow.

The return system is typically balanced when the system (supply VAVs) is set to maximum cooling airflow. This should drive the return fan to its required maximum system airflow. The return air system is then proportionally balanced to obtain the design airflows at each inlet.

The return air system is a pressure dependent system and the main factor affecting the airflow to the individual return inlets is the return fan speed and the amount of airflow and pressure present in the duct system.

The return air system is designed and the ductwork is sized for “maximum” system airflow and the ability of the system to obtain design return airflow at all of the return inlets. The return airflow in the duct and at the inlets changes once the return fan speed is reduced from “maximum” airflow. The return fan speed is typically controlled by tracking the supply fan by an offset speed or airflow value; maintaining a plenum pressure; or maintaining a building pressure. It should be noted that none of these control scenarios are associated with maintaining the design return airflow at the individual return air inlets.

Myth 1: Return airflow at the inlets changes exactly proportional with respect to a change in return fan speed.

The airflow at the individual inlets will not remain proportionally balanced exactly as the speed of the fan is decreased. If the return fan speed is reduced 25%, the return airflow at each individual inlet is not proportionally reduced exactly 25%. Originally the ductwork was sized for “maximum” airflow and now that the total system airflow has been reduced, it is “oversized” for the reduced airflow. At the reduced fan speed the following properties in the ductwork are reduced: air velocity, friction loss, velocity pressure, and static pressure. It should be noted that the amount of “imbalance” will increase as the return fan speed is further decreased and it is possible that little or no airflow can be measured at a return inlet located a good distance from the return fan.

Table 1 displays the anticipated properties of air in a section of ductwork for a return air system at reduced fan speeds.

Myth 2: The return inlet airflow changes as the associated supply VAV changes in airflow.

The amount of conditioned air supplied by a VAV box into a room will vary from maximum to minimum based on a thermostat setting change, change in occupancy, solar load, equipment operating conditions, etc. The amount of air returned from the room varies gradually as the building load changes and the return fan speed changes. Therefore, once the system is operating under control, the supply air to return air ratio for given areas is subject to constant change. The supply airflow and return airflow systems are not a closed coupled system.

Once the air handling system is put into operation under direct digital control (DDC), the return airflows originally reported cannot be repeated. In order to repeat airflow measurements at the return inlets, the system must be indexed to the mode that it was operating in during balancing. This operating mode is typically with all supply VAVs indexed to maximum cooling and the return fan at maximum airflow.

If return airflow balancing is required for the VAV system, then an evaluation should be performed on the requirements and approach to performing the air balancing.

1. Is individual airflow at each return inlet critical? Will system or building performance be affected if the airflow at these inlets is not obtained?

2. Can the return airflow be proportioned by area or floor (in lieu of individual inlets) and satisfy the system/ building requirements? Are balancing dampers located in the key areas to allow this to happen?

3. If return airflow balancing is critical for the system/building operation, then the system should be made pressure independent and the use of VAV boxes on the return air system should be employed.

James E. Hall is president and owner of Systems Management & Balancing. Odean H. Jukam is past president and a consultant with Systems Management & Balancing. The firm provides independent, objective, and professional testing of HVAC systems. This article originally ran in the Spring 2012 TAB Journal, published by the Associated Air Balance Council.

Do you have experience and expertise with the topics mentioned in this content? You should consider contributing to our CFE Media editorial team and getting the recognition you and your company deserve. Click here to start this process.

VAV systems and return air balancing | Consulting - Specifying Engineer (2024)
Top Articles
Procurement Risks & How To Mitigate Them | Planergy Software
Increase Your Chances of Getting into Nursing School: 7 Ways
Forozdz
Thor Majestic 23A Floor Plan
Trevor Goodwin Obituary St Cloud
Time in Baltimore, Maryland, United States now
Big Spring Skip The Games
50 Meowbahh Fun Facts: Net Worth, Age, Birthday, Face Reveal, YouTube Earnings, Girlfriend, Doxxed, Discord, Fanart, TikTok, Instagram, Etc
Beautiful Scrap Wood Paper Towel Holder
Sportsman Warehouse Cda
The Pope's Exorcist Showtimes Near Cinemark Hollywood Movies 20
Infinite Campus Parent Portal Hall County
5808 W 110Th St Overland Park Ks 66211 Directions
Steamy Afternoon With Handsome Fernando
Hellraiser III [1996] [R] - 5.8.6 | Parents' Guide & Review | Kids-In-Mind.com
Nail Salon Goodman Plaza
Mychart Anmed Health Login
Forest Biome
Jenna Ortega’s Height, Age, Net Worth & Biography
Scream Queens Parents Guide
Jc Green Obits
The Largest Banks - ​​How to Transfer Money With Only Card Number and CVV (2024)
Shadbase Get Out Of Jail
Hampton University Ministers Conference Registration
Delectable Birthday Dyes
Regina Perrow
13301 South Orange Blossom Trail
Garden Grove Classlink
Kempsville Recreation Center Pool Schedule
Craigs List Tallahassee
Dubois County Barter Page
How does paysafecard work? The only guide you need
Giantess Feet Deviantart
Staar English 1 April 2022 Answer Key
Craigslist Mount Pocono
Ticketmaster Lion King Chicago
دانلود سریال خاندان اژدها دیجی موویز
Culvers Lyons Flavor Of The Day
1v1.LOL Game [Unblocked] | Play Online
Danielle Ranslow Obituary
Craigslist Farm And Garden Reading Pa
814-747-6702
Reilly Auto Parts Store Hours
Joblink Maine
Noga Funeral Home Obituaries
4Chan Zelda Totk
Bismarck Mandan Mugshots
17 of the best things to do in Bozeman, Montana
Lira Galore Age, Wikipedia, Height, Husband, Boyfriend, Family, Biography, Net Worth
Aspen.sprout Forum
Koniec veľkorysých plánov. Prestížna LEAF Academy mení adresu, masívny kampus nepostaví
Latest Posts
Article information

Author: Nathanael Baumbach

Last Updated:

Views: 6123

Rating: 4.4 / 5 (75 voted)

Reviews: 82% of readers found this page helpful

Author information

Name: Nathanael Baumbach

Birthday: 1998-12-02

Address: Apt. 829 751 Glover View, West Orlando, IN 22436

Phone: +901025288581

Job: Internal IT Coordinator

Hobby: Gunsmithing, Motor sports, Flying, Skiing, Hooping, Lego building, Ice skating

Introduction: My name is Nathanael Baumbach, I am a fantastic, nice, victorious, brave, healthy, cute, glorious person who loves writing and wants to share my knowledge and understanding with you.