Reporting
GAO Report to Congress, April 2015
BLM Report to Congress - HSA Section 19
Presentations from the 27th Annual Storage Contract Meeting
27th Annual Storage Contract Meeting Agenda
BLM Storage Meeting Budget Presentation
Overview of Federal Real Property Disposal Process
Project Updates BLM Contracting
Project Update BLM Engineering
Plant Outages
For each plant outage, a description of the beginning and end of the outage, including the pressure of the pipeline or deviation from the normal operation of the pipeline and, if unplanned, the nature of the problem.
2020 CHEU Plant Outage, through 7/22/2020 2019 CHEU Plant Outage 2018 CHEU Plant Outage 2017 CHEU Plant Outage 2016 CHEU Plant Outage 2015 CHEU Plant Outage 2014 CHEU Plant Outage 2013 CHEU PlantOutageMonthly summaries of meetings and communications
Monthly summaries of meetings and communications between the Bureau of Land Management and the Cliffside Refiners Limited Partnership, including a list of participants and an indication of any actions taken as a result of the meetings or communications
Current predictions of the lifespan of the Federal Helium System
Current predictions of the lifespan of the Federal helium system, including how much longer the crude helium supply will be available based on current and forecasted demand and the projected maximum production capacity of the Federal helium system for the following fiscal year.
Methodology for Calculating Helium Price
Bush Dome Helium Reservoir: Annual Helium Conference July 23, 2020
GSA Disposal Process for Cliffside, July 23, 2020
Bush Dome Helium Reservoir: Annual Helium Conference July 18, 2019
Bush Dome Helium Reservoir: Annual Helium Conference July 19, 2018
Bush Dome Helium Reservoir: Annual Helium Conference July 20, 2017
Bush Dome Helium Reservoir: Annual Helium Conference July 21, 2016
Prediction Results Tables (2021-2029) Estimated Production as developed by Nitec, LLC.