NEC4: Engineering and Construction Contract | Products (2024)

The NEC4 Engineering and Construction Contract (ECC) is the main works contract in the NEC4 suite of collaborative, flexible and clearly written contracts for built environment procurement.

The ECC can include any level of design. It has six main payment Options: A (priced contract with activity schedule), B (priced contract with bill of quantities), C (target contract with activity schedule), D (target contract with bill of quantities), E (cost reimbursable contract) and F (management contract).

As such, the contract can be used for the full range of financial risk allocation, from placing most risk with the contractor (options A and B), to risk sharing (options C and D) and placing most risk with the client (options E and F). Each ECC Option can be purchased separately if required.

In addition to the main Options, the document contains everything you need to prepare, tender and manage an NEC4 ECC contract, including all secondary Options and forms for the relevant cost schedules and contract data.

Background

The NEC4 ECC has a global track record for delivering all kinds and sizes of building and infrastructure projects on time, on budget and to the highest environmental and quality standards.

As with all NEC4 contracts, the parties are required to act in a ‘spirit of mutual trust and co-operation’ and give early warnings of anything that could affect time, cost or quality so it can be mitigated without delay. Change is dealt with by a fast and fair compensation event process which, together with a continually updated and agreed programme, ensures there are no surprises at completion.

NEC4: Engineering and Construction Contract | Products (2024)

FAQs

What is the NEC4 engineering construction contract? ›

The NEC4 Engineering and Construction Contract (ECC) has been developed for the appointment of a contractor for engineering and construction project work, including any level of design responsibility.

Which are the 6 main options in the engineering and construction contract? ›

The ECC can include any level of design. It has six main payment Options: A (priced contract with activity schedule), B (priced contract with bill of quantities), C (target contract with activity schedule), D (target contract with bill of quantities), E (cost reimbursable contract) and F (management contract).

When to use NEC4? ›

The NEC4 Supply Short Contract (SSC) is perfect for lower risk items such as building materials and products, stationery, personal protective equipment and parts.

What is the new engineering contract option C? ›

NEC Option C is a cost reimbursable contract set against a target contract price, more commonly known as the target cost. The NEC defines cost through its schedule of cost components (SoCC). There is also definition as to what is allowable and disallowable.

What are the benefits of a NEC4 contract? ›

Key benefits of NEC4 include:
  • Streamlined processes and updated definitions.
  • Improved contract administration and reduced administration costs.
  • Greater clarity and reduced potential for problems.
  • Provision for building information modelling and early contractor involvement.
  • Improved risk opportunity and risk management.
Apr 13, 2017

What are the disadvantages of the NEC contract? ›

Limited scope: NEC contracts are not suitable for all types of projects. For example, they are not well-suited to projects that involve a high degree of design risk. Cost: NEC contracts can be more expensive than other forms of contract.

What is the difference between NEC3 and NEC 4? ›

One key difference between NEC3 and NEC4 is the approach to the fee percentage. The NEC3 allowed a “subcontracted fee percentage” to cover subcontractor's overheads and profit and “direct fee percentage” to cover the subcontractor's own direct costs.

What are the Z clauses in NEC4? ›

Z clauses are used to amend the standard NEC contract clauses by means of adding new clauses or amending the wording of existing clauses. They are incorporated through the contract data.

What is the difference between NEC4 and JCT? ›

Generally, NEC contracts are aimed at engineering projects but are easily adapted to building works. JCT contracts are aimed at building works rather than engineering projects but again can be adapted for both.

What is the difference between NEC4 Option A and B? ›

NEC Option B

Priced contract with bill of quantities – Compared with Option A, the main difference is the use of a bill of quantities (BoQ) – similar to that of a Joint Contracts Tribunal (JCT). It can be used on projects such as infrastructure and buildings.

What is equipment in NEC4? ›

In the NEC3 and NEC4 Engineering and Construction Contract (ECC), equipment is defined as what the contractor uses to provide the works.

What is the NEC4 engineering and construction contract? ›

The NEC4 ECC Option A is the priced main works contract with an activity schedule. It can include any level of design, and is ideal for relatively straightforward projects where the client has a fixed budget and is confident of its contractor's willingness and ability to manage financial risk.

What are the two new NEC4 contracts? ›

To answer market's demands and industry's developments, NEC4 introduces two new contracts: NEC4 Design, Build and Operate Contract (DBO) and the consultative NEC4 Alliance Contract (ALC).

How does the NEC4 option C work? ›

It can include any level of design, and is ideal for more complex or larger projects where the client and contractor are willing to share project financial risk in a fully collaborative way. The contractor prices activities in the client's activity schedule based on actual cost plus a fee, resulting in a target price.

What is the NEC new engineering contract? ›

The New Engineering Contract (NEC) is a series of contracts designed to manage any project from start to finish. The contracts are written in plain English with a straightforward structure and are designed to be easily understood. NEC contracts aim to prevent costly disputes.

What is the definition engineering procurement construction contract? ›

Engineering, procurement, and construction (EPC) contracts (a type of turnkey contract) are a form of contract used to undertake construction works by the private sector on large-scale and complex infrastructure projects.

What is an engineering contract? ›

Engineering contracts are formal agreements that assign the specific terms and conditions governing the relationship between clients and engineering firms.

What is the difference between NEC4 and Fidic? ›

The NEC is often considered a more progressive contract, aiming to patch some of the downfalls of prior construction contracts. The FIDIC is often described as a more traditional contract. Each contract appoints a person who acts on behalf of the employer.

Top Articles
Linux: How-To - Login with a SSH Private Key - CloudBolt Software
Computing and Archiving Research Environment (COARE)
English Bulldog Puppies For Sale Under 1000 In Florida
Katie Pavlich Bikini Photos
Gamevault Agent
Pieology Nutrition Calculator Mobile
Hocus Pocus Showtimes Near Harkins Theatres Yuma Palms 14
Hendersonville (Tennessee) – Travel guide at Wikivoyage
Compare the Samsung Galaxy S24 - 256GB - Cobalt Violet vs Apple iPhone 16 Pro - 128GB - Desert Titanium | AT&T
Vardis Olive Garden (Georgioupolis, Kreta) ✈️ inkl. Flug buchen
Craigslist Dog Kennels For Sale
Things To Do In Atlanta Tomorrow Night
Non Sequitur
Crossword Nexus Solver
How To Cut Eelgrass Grounded
Pac Man Deviantart
Alexander Funeral Home Gallatin Obituaries
Shasta County Most Wanted 2022
Energy Healing Conference Utah
Geometry Review Quiz 5 Answer Key
Hobby Stores Near Me Now
Icivics The Electoral Process Answer Key
Allybearloves
Bible Gateway passage: Revelation 3 - New Living Translation
Yisd Home Access Center
Home
Shadbase Get Out Of Jail
Gina Wilson Angle Addition Postulate
Celina Powell Lil Meech Video: A Controversial Encounter Shakes Social Media - Video Reddit Trend
Walmart Pharmacy Near Me Open
Marquette Gas Prices
A Christmas Horse - Alison Senxation
Ou Football Brainiacs
Access a Shared Resource | Computing for Arts + Sciences
Vera Bradley Factory Outlet Sunbury Products
Pixel Combat Unblocked
Movies - EPIC Theatres
Cvs Sport Physicals
Mercedes W204 Belt Diagram
Mia Malkova Bio, Net Worth, Age & More - Magzica
'Conan Exiles' 3.0 Guide: How To Unlock Spells And Sorcery
Teenbeautyfitness
Where Can I Cash A Huntington National Bank Check
Topos De Bolos Engraçados
Sand Castle Parents Guide
Gregory (Five Nights at Freddy's)
Grand Valley State University Library Hours
Holzer Athena Portal
Hello – Cornerstone Chapel
Stoughton Commuter Rail Schedule
Selly Medaline
Latest Posts
Article information

Author: Chrissy Homenick

Last Updated:

Views: 6176

Rating: 4.3 / 5 (74 voted)

Reviews: 81% of readers found this page helpful

Author information

Name: Chrissy Homenick

Birthday: 2001-10-22

Address: 611 Kuhn Oval, Feltonbury, NY 02783-3818

Phone: +96619177651654

Job: Mining Representative

Hobby: amateur radio, Sculling, Knife making, Gardening, Watching movies, Gunsmithing, Video gaming

Introduction: My name is Chrissy Homenick, I am a tender, funny, determined, tender, glorious, fancy, enthusiastic person who loves writing and wants to share my knowledge and understanding with you.