India needs ₹4.75 tn investment in transmission infrastructure | Mint (2024)

New Delhi: India requires a substantial investment of 4.75 trillion by 2027 for developing its transmission infrastructure, including lines, substations, and reactive compensation, as per a draft plan floated by the Central Electricity Authority (CEA). This projection aligns with the Centre's initiative to boost the national transmission system, facilitating integration of renewable energy capacities.

The CEA has sought stakeholders' comments and recommendations on its draft National Electricity Plan (Volume II) for transmission by 26 March.

As on 31 October 2023, India's renewable energy capacity stood at 178.98 gigawatt (GW), including 46.85 GW from large hydro sources, accounting for approximately 42% of the country's total power generation capacity.

The cost projection is based on the expectation that by the year 2026-27, India's power generation capacity will reach 650.26 GW. This includes 235.13 GW from thermal sources and 206.14 GW from solar. Additionally, a battery energy storage system (BESS) capacity of 13.5 GW is anticipated. By 2031-32, the CEA expects the country's total installed generation capacity to rise to 900 GW.

India aims to increase its non-fossil fuel-based electricity generation capacity to 500 GW by 2030. To achieve this, regions with high solar and wind potential need to be connected to the Inter-State Transmission System (ISTS) for efficient power evacuation to demand centres.

The plan includes 170 transmission schemes with a total estimated cost exceeding 3.13 trillion for inter-state transmission and around 1.61 trillion for intra-state systems.

The plan also outlines a 15,120 crore investment to connect the Andaman & Nicobar Islands to the mainland. Currently, these islands rely primarily on diesel generators, supplemented by minor renewable sources. A pioneering project to link the islands through an under-sea cable spanning 1,150 km is proposed, aiming to facilitate green energy transition by 2028-29.

The CEA draft includes the completion of a high voltage direct current (HVDC) link between Madurai, India, and New Habarana, Sri Lanka, with 2x500 MW HVDC terminals post 2026-27. This project is in its advanced stages of discussion.

The National Electricity Plan (Volume I) focusing on generation planning was published in May of the previous year, and the Volume II on transmission will be finalized following stakeholder consultations.

Catch all the Industry News, Banking News and Updates on Live Mint. Download The Mint News App to get Daily Market Updates.

MoreLess

First Published:

26 Jan 2024, 02:09 PM IST

Business NewsIndustryEnergyIndia needs ₹4.75 tn investment in transmission infra to boost renewable energy integration by 2027

India needs  ₹4.75 tn investment in transmission infrastructure | Mint (2024)
Top Articles
Which countries are tax-free? What are the best tax havens? | CurrencyTransfer
Fast Loan - Quick Cash Loan Online | Blend Philippines
Is Paige Vanzant Related To Ronnie Van Zant
Elleypoint
Okatee River Farms
Mikayla Campino Video Twitter: Unveiling the Viral Sensation and Its Impact on Social Media
Amateur Lesbian Spanking
Horned Stone Skull Cozy Grove
Mercy MyPay (Online Pay Stubs) / mercy-mypay-online-pay-stubs.pdf / PDF4PRO
Red Heeler Dog Breed Info, Pictures, Facts, Puppy Price & FAQs
Brenna Percy Reddit
Dit is hoe de 130 nieuwe dubbele -deckers -treinen voor het land eruit zien
Most McDonald's by Country 2024
Sivir Urf Runes
Locate At&T Store Near Me
Cambridge Assessor Database
Is Grande Internet Down In My Area
Union Ironworkers Job Hotline
Lowe's Garden Fence Roll
White Pages Corpus Christi
Airrack hiring Associate Producer in Los Angeles, CA | LinkedIn
Hermitcraft Texture Pack
Why Does Lawrence Jones Have Ptsd
Why Should We Hire You? - Professional Answers for 2024
Milanka Kudel Telegram
Hewn New Bedford
The Tower and Major Arcana Tarot Combinations: What They Mean - Eclectic Witchcraft
PCM.daily - Discussion Forum: Classique du Grand Duché
3Movierulz
Walmart Pharmacy Near Me Open
Drying Cloths At A Hammam Crossword Clue
Znamy dalsze plany Magdaleny Fręch. Nie będzie nawet chwili przerwy
Foodsmart Jonesboro Ar Weekly Ad
Cardaras Funeral Homes
Busted Mugshots Paducah Ky
Grave Digger Wynncraft
*!Good Night (2024) 𝙵ull𝙼ovie Downl𝚘ad Fr𝚎e 1080𝚙, 720𝚙, 480𝚙 H𝙳 HI𝙽DI Dub𝚋ed Fil𝙼yz𝚒lla Isaidub
United E Gift Card
Club Keno Drawings
Emiri's Adventures
Www Violationinfo Com Login New Orleans
Goodwill Houston Select Stores Photos
Consume Oakbrook Terrace Menu
Retire Early Wsbtv.com Free Book
Express Employment Sign In
Alston – Travel guide at Wikivoyage
Darkglass Electronics The Exponent 500 Test
20 Mr. Miyagi Inspirational Quotes For Wisdom
Slug Menace Rs3
The 5 Types of Intimacy Every Healthy Relationship Needs | All Points North
Island Vibes Cafe Exeter Nh
Latest Posts
Article information

Author: Patricia Veum II

Last Updated:

Views: 5767

Rating: 4.3 / 5 (64 voted)

Reviews: 95% of readers found this page helpful

Author information

Name: Patricia Veum II

Birthday: 1994-12-16

Address: 2064 Little Summit, Goldieton, MS 97651-0862

Phone: +6873952696715

Job: Principal Officer

Hobby: Rafting, Cabaret, Candle making, Jigsaw puzzles, Inline skating, Magic, Graffiti

Introduction: My name is Patricia Veum II, I am a vast, combative, smiling, famous, inexpensive, zealous, sparkling person who loves writing and wants to share my knowledge and understanding with you.