Edited by Paul Naybour on the 21st January 2018 to align more with the answer expected in the APM PMQ exam. For training on how to write a Project Management Plan, look at our APM Project Management Qualificationscourses.

The creation of the project management plan starts in the concept phase and is finalised at the end of the definition stage of the project lifecycle.

Five major components of the project management plan are:

  1. Executive Summary – describes the nature of the project deliverables created to satisfy the project requirements and organisation needs.
  2. Policy and Procedures
  3. Schedules
  4. Timeline plans
  5. Budgets
1) Executive Summary

This section will define the purpose of the project, the objectives express as success criteria, which as a minimum would include time, cost and quality. This would set out the main phases and stages of the project. The executive summary of the project management plan would describe the overall procurement strategy, how the project is being broken into different contract packages.

Ready to learn more about effective planning?

Explore our Project Management Courses

Strat Learning Today

2) Policy and Procedures

This section will describe the procedures that will be used to control the project. These will vary from project to project (and organisation to organisation). Typically they will refer to standard approaches in an organisation method. Typically these could include:

  1. A quality management plan; which describes how we will make sure the products are fit for propose.
  2. A health and safety policy which will describe how safety risks are managed.
  3. Project control policy which sets out how the project reports will be generated.

Often this section will just refer to organisational procedures, but the PM has the opportunity to vary these to fit the needs of the project. Maybe increasing the requirements for configuration management, for example.

3) Schedules

This section describes in detail the schedules and logs that define the detailed plans for the project. Again these can be references to external documents or files held in tools such as Microsoft Project.

Included will be a high-level schedule, which highlights the key deliverables in the form of a milestone schedule. Should also include estimates of cost and resource requirements. Specific contents include

  1. Project lifecycle which sets out the overall phases of the project.
  2. Precedence diagrams which describe the dependencies between the different work packages.
  3. Resource histograms which set our the resources required to deliver the project against the resource availability.
  4. Gantt chart which sets out the timeline the project showing when each activity is scheduled to start and finish.
4) Resource Plans

As a minimum, each project should have a project sponsor and a project manager!

This section would also include:

  1. Responsibility of assignment matrix – which defines who is responsible for the completion of each product
  2. Organisation breakdown structure, which shows the organisation hierarchy of the project
  3. Authority and delegation schedules, which defines the delegation of authority within the project for the approval of documents, expenditures and acceptance
  4. Role descriptions which defines the overall responsibilities.
5) Budgeting and Cost Management

Is the estimating of costs and the setting of an agreed budget, and the management of actual and forecast costs against that budget. Being able to predict with some certainty the rate at which the project is spending its funds is crucial to know whether the project is on track. This includes

  1. A cost plan showing the planned expenditure, with time, for each work package.
  2. A reference to the accounting system to show how these costs will be recorded.
  3. Often a cost and commitment tracker so the PM can keep a track of the overall costs. Often this is separate from the corporate finance systems.

5 Comments Leave a comment

  1. Describe The Five Major Components Of A Project Management Plan (1)Paul Naybour says:

    21st October 2016 at 9:16 am

    The first four points are fine, but the last one needs a bit more detail.

    Reply

  2. Describe The Five Major Components Of A Project Management Plan (2)Paul Naybour says:

    21st January 2018 at 9:13 am

    Hi I edited your answer to improve the structure and content.

    Reply

  3. Describe The Five Major Components Of A Project Management Plan (3)Michelle says:

    18th June 2018 at 3:10 pm

    Thanks Paul for updating this answer – it’s always good to remind candidates answering “describe” questions such as “Describe The Five Major Components of a Project Management Plan” for the the APM PMQ exam (formerly known as the APMP) the importance of adding enough detail to show that they have both a basic understanding and a deeper understanding of the topic.
    And also good to be reminded to actually list the components first that they are going on to describe. The list alone, as you say elsewhere, is worth 20% of the total marks for such a question.

    Reply

  4. Describe The Five Major Components Of A Project Management Plan (4)Aaron C says:

    10th August 2022 at 10:29 am

    Hi Paul, how does your answer above match with the APM BoK7 PMP components of; Who, How, What, Where, When, How Much and Why (Figure 4.2.10)?

    Thank you.

    Reply

    • Describe The Five Major Components Of A Project Management Plan (5)pnaybour says:

      10th August 2022 at 11:20 am

      Hi

      This is from 2018 so is based on BoK6. It’s also not in the format of an exam answer. My who, what, when etc is a prompt list highlighting areas you could cover if you are stuck. It’s not a straight jack to be used in every answer, they are hints if you get stuck. The PMP has lots of content in the what part so you don’t need the others. I hope that helps.

      Reply

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Describe The Five Major Components Of A Project Management Plan (2024)
Top Articles
SAP HCM pros and cons: tips and advice from real users 2024
Webtel | India's Leading 'e' Compliance Solutions Company
NOAA: National Oceanic & Atmospheric Administration hiring NOAA Commissioned Officer: Inter-Service Transfer in Spokane Valley, WA | LinkedIn
Nybe Business Id
Algebra Calculator Mathway
Frank Lloyd Wright, born 150 years ago, still fascinates
Nesb Routing Number
Volstate Portal
Palace Pizza Joplin
Monticello Culver's Flavor Of The Day
Swimgs Yung Wong Travels Sophie Koch Hits 3 Tabs Winnie The Pooh Halloween Bob The Builder Christmas Springs Cow Dog Pig Hollywood Studios Beach House Flying Fun Hot Air Balloons, Riding Lessons And Bikes Pack Both Up Away The Alpha Baa Baa Twinkle
Tiraj Bòlèt Florida Soir
Pollen Count Los Altos
Iron Drop Cafe
Lqse-2Hdc-D
Cincinnati Bearcats roll to 66-13 win over Eastern Kentucky in season-opener
Enderal:Ausrüstung – Sureai
Babyrainbow Private
Crossword Nexus Solver
Hilo Hi Craigslist
Overton Funeral Home Waterloo Iowa
Comics Valley In Hindi
Lonesome Valley Barber
Everything you need to know about Costco Travel (and why I love it) - The Points Guy
Beaufort 72 Hour
R Baldurs Gate 3
Shelby Star Jail Log
Maine Racer Swap And Sell
The Collective - Upscale Downtown Milwaukee Hair Salon
Hannah Jewell
APUSH Unit 6 Practice DBQ Prompt Answers & Feedback | AP US History Class Notes | Fiveable
Kelley Fliehler Wikipedia
Rlcraft Toolbelt
Att U Verse Outage Map
Los Amigos Taquería Kalona Menu
Human Unitec International Inc (HMNU) Stock Price History Chart & Technical Analysis Graph - TipRanks.com
Hypixel Skyblock Dyes
Litter-Robot 3 Pinch Contact & DFI Kit
Best Workers Compensation Lawyer Hill & Moin
Body Surface Area (BSA) Calculator
Hometown Pizza Sheridan Menu
Gt500 Forums
The All-New MyUMobile App - Support | U Mobile
Lcwc 911 Live Incident List Live Status
Barstool Sports Gif
5A Division 1 Playoff Bracket
Alston – Travel guide at Wikivoyage
Costco The Dalles Or
The Machine 2023 Showtimes Near Roxy Lebanon
Turok: Dinosaur Hunter
Grace Family Church Land O Lakes
Uncle Pete's Wheeling Wv Menu
Latest Posts
Article information

Author: Kieth Sipes

Last Updated:

Views: 5745

Rating: 4.7 / 5 (47 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Kieth Sipes

Birthday: 2001-04-14

Address: Suite 492 62479 Champlin Loop, South Catrice, MS 57271

Phone: +9663362133320

Job: District Sales Analyst

Hobby: Digital arts, Dance, Ghost hunting, Worldbuilding, Kayaking, Table tennis, 3D printing

Introduction: My name is Kieth Sipes, I am a zany, rich, courageous, powerful, faithful, jolly, excited person who loves writing and wants to share my knowledge and understanding with you.