Allowable Construction Tolerances for Retaining Walls (2024)

Allowable Construction Tolerances for Retaining Walls (1)

Figure 13: Vertical Control

To ensure that acceptable work standards are understood during retaining wall installation, construction tolerances need to be established. These construction tolerances should consider that the retaining wall is designed to be a flexible structure that tolerates horizontal and vertical variation. However, too much variation can affect the structural stability of the wall.

To maintain horizontal and vertical control, adjustments may be required during modular block installation. Even with tight quality control procedures by block manufactures, modular block units may vary in height. Shimming a maximum of 3 mm per block is acceptable construction practice. It is recommended that shimming material be asphaltic or non-degradable products.

Acceptable construction tolerances are illustrated in Figures 13 thru 16.

Differential Settlement

Allowable Construction Tolerances for Retaining Walls (2)

Figure 14: Differential Settlement

Foundation settlements must be estimated with great care for buildings, bridges, towers, power plants, and similar high-cost structures. For structures such as fills, earth dams, levees, and retaining walls a greater margin of error in settlements can usually be tolerated. The construction method of placing the dry-stacked mortarless Allan Block on an aggregate leveling pad creates a flexible but stable retaining wall. Settlement errors that are acceptable while maintaining structural integrity include large total wall settlement and moderate differential settlement as depicted in Figure 14.


Allowable Construction Tolerances for Retaining Walls (3)

Figure 15: Horizontal Control

Settlement occurs when the weight of the retaining wall structure exceeds the bearing capacity of the soil. Cohesionless soils consisting of sands and gravels often exhibit very little settlement with most of the settlement occurring during or shortly after wall construction. Cohesive soils with high moisture content have the potential for large time-depended settlement because the weight of the wall can actually compress the foundation soil. The settlement can be estimated using conventional one-dimensional consolidation calculations. When anticipated settlement is greater than the construction tolerances, special design and construction steps need to be taken.

Post Construction Finish and Appearance

Allowable Construction Tolerances for Retaining Walls (4)

Figure 16: Rotation

Depending on wall heights, surcharges, soil conditions and foundation materials, some stress cracks may occur in the wall during and after construction. Since Allan Block walls are flexible structures, some cracking of block is likely, as are spaces between blocks as the wall moves. These openings should not exceed 6 mm and do not affect the structural integrity of the wall.

Allowable Construction Tolerances for Retaining Walls (2024)
Top Articles
Forgiveness for SBA Loans in Default
List of Stocks Under 50 rs in India to watch in 2024 | BlinkX
Where To Go After Howling Pit Code Vein
Skyward Sinton
Craglist Oc
Caroline Cps.powerschool.com
Sam's Club Gas Price Hilliard
Hotels Near 500 W Sunshine St Springfield Mo 65807
Flights to Miami (MIA)
Mawal Gameroom Download
Evita Role Wsj Crossword Clue
Joe Gorga Zodiac Sign
Www.paystubportal.com/7-11 Login
Keurig Refillable Pods Walmart
Hope Swinimer Net Worth
About Us | TQL Careers
Mini Handy 2024: Die besten Mini Smartphones | Purdroid.de
2015 Honda Fit EX-L for sale - Seattle, WA - craigslist
Best Suv In 2010
Unlv Mid Semester Classes
24 Hour Drive Thru Car Wash Near Me
2020 Military Pay Charts – Officer & Enlisted Pay Scales (3.1% Raise)
Lehmann's Power Equipment
Royal Cuts Kentlands
Teacup Yorkie For Sale Up To $400 In South Carolina
Lisas Stamp Studio
Understanding Gestalt Principles: Definition and Examples
Drift Hunters - Play Unblocked Game Online
Barista Breast Expansion
Villano Antillano Desnuda
Does Royal Honey Work For Erectile Dysfunction - SCOBES-AR
Ff14 Sage Stat Priority
Shauna's Art Studio Laurel Mississippi
Magicseaweed Capitola
10 games with New Game Plus modes so good you simply have to play them twice
Labyrinth enchantment | PoE Wiki
„Wir sind gut positioniert“
Google Flights Orlando
Exploring the Digital Marketplace: A Guide to Craigslist Miami
Craigslist Minneapolis Com
Sound Of Freedom Showtimes Near Amc Mountainside 10
Rocket Lab hiring Integration & Test Engineer I/II in Long Beach, CA | LinkedIn
Sherwin Source Intranet
Iron Drop Cafe
300+ Unique Hair Salon Names 2024
Rocket Bot Royale Unblocked Games 66
Minecraft Enchantment Calculator - calculattor.com
The Missile Is Eepy Origin
Ff14 Palebloom Kudzu Cloth
211475039
The Love Life Of Kelsey Asbille: A Comprehensive Guide To Her Relationships
Latest Posts
Article information

Author: Prof. Nancy Dach

Last Updated:

Views: 5474

Rating: 4.7 / 5 (57 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Prof. Nancy Dach

Birthday: 1993-08-23

Address: 569 Waelchi Ports, South Blainebury, LA 11589

Phone: +9958996486049

Job: Sales Manager

Hobby: Web surfing, Scuba diving, Mountaineering, Writing, Sailing, Dance, Blacksmithing

Introduction: My name is Prof. Nancy Dach, I am a lively, joyous, courageous, lovely, tender, charming, open person who loves writing and wants to share my knowledge and understanding with you.