Failing to plan is planning to fail

10 Project Planning Best Practices | Zenkit (2)

Any project manager worth their weight in gold will tell you the importance of project planning. A crucial component in the project management process is how much time and effort you put into project planning can be what makes or breaks your project. In this article, I’ll talk about the importance of project planning, what it involves, and how to best create a project plan.

10 Project Planning Best Practices | Zenkit (3)

The Importance of Project Planning

It goes without saying that a well-planned out project has a higher chance of succeeding than one that doesn’t. That’s not to say, however, that just because you have a plan means your project is infallible. There are many complex reasons why projects fail, but having some kind of a game plan in place can be one less reason.

Project planning is the second phase of the project management life cycle. It takes place after the initiation phase which is where ideas are explored, preliminary research gets done, and the decision for the project to proceed has been made. The project planning phase involves discussing client requirements and stakeholder concerns, establishing project goals and objectives, assembling a team, and creating a project plan.

What Is a Project Plan?

Creating the project plan is perhaps the most important aspect of project planning. Projects come in all different shapes and sizes, from introducing new software into a company to a high scale corporate office relocation. But they all serve the same purpose — to deliver tasks and activities with the hope of achieving an end goal. In order to do this, the project is guided by a project plan.

The purpose of a project plan

Having a project plan in place ensures a smarter way of working. Sure, you can proceed with a project without a written strategy, but just how effective do you think that will be? The purpose of a project plan is to provide direction throughout the duration of the project. At the very least it should cover the why, what, who, and when details of the project.

The project planning document should detail both individual and group objectives and instructions. Having everything laid out on a written document will ensure everyone involved knows the purpose of what’s happening and have something to refer to throughout the project implementation. Another advantage of having everything written out on a document will highlight any anticipated roadblocks, hiccups, and hidden costs. It will prepare you for what’s to come and so the purpose of your project won’t be too affected negatively.

What goes into a project plan

Having a well-developed project plan is essential to a project’s success. Often mistaken for only outlining the project timeline, the project plan should contain everything involved in the project planning process. This includes the execution, management, and control of the project, which should cover details pertaining to goals, deadlines, timeframes, measurements, budget, staffing, and resources.

10 Project Planning Best Practices | Zenkit (4)

Experience seamless project collaboration and organization. Sign up for free today!

Elements of a project plan:

  • Scope management
  • Requirements management
  • Schedule management
  • Financial management
  • Quality management
  • Resource management
  • Stakeholder management
  • Communications management
  • Project change management
  • Risk management

The project plan should not only aim to coordinate all of its components, but it should also foresee any challenges and risks associated.

10 Project Planning Best Practices | Zenkit (5)

10 Project Planning Best Practices

  1. Be professional

    When persuading potential stakeholders to get behind your project, ensure the ‘business case’ you use is a formal, written document. This will solidify your ambition for the project, and also gives off a professional vibe.

  2. Expect risks

    Don’t forget to do a risk assessment in your project plan. Project work can be precarious, and you’d be a fool not to expect risks. As part of your initial step, do a risk assessment to evaluate the provisions you may need to take for tasks that are a high-level risk. Make sure to include buffer time in your schedule.

  3. Complete risky tasks first

    Speaking of high-level risk tasks, plan to work on tasks that have the highest level of risk first. Doing so will mitigate risk and can ensure that there’s enough time to sort things out should anything go wrong.

  4. Control change

    Change is inevitable when it comes to delivering a project, however, that doesn’t mean it should turn your team off course. Having a change control process in place will prevent unexpected changes from taking over your project. It doesn’t have to be complex, all it has to include are the steps that should be taken when a proposed change is introduced.

  5. Choose your team wisely

    Your project is only as good as the people executing it, so make sure you know the availability of your team members when you recruit them. Overlooking holidays or planned time off may result in project delays. Avoid hiccups by including this time in your project plan schedule, or by finding temporary relief options.

  6. Invest in them also

    Don’t be adverse to upskilling your team when it comes to assembling them. Offering training and support may seem like extra work but it can bring loyalty to the project, as well as efficiency in the long run.

  7. Develop a close team

    Once you’ve put together your perfect crew, break the ice by doing a couple of team-building activities. Not only is getting to know your colleagues a crucial aspect of teamwork but having trust and comfort will emphasize that cohesion.

  8. Keep stakeholders connected

    Remember that stakeholders aren’t just people who have hired you to do the project. They are anyone who is affected by the outcome of the project. When convincing them of your vision in the initial step, or communicating changes and progress updates of the project plan, don’t forget to include all of the people who are invested.

  9. Have the right tools

    A given, but it has to be said— use a cloud-based project management solution. Not only can it provide you with the tools you need to simplify the process, but it will equip your team to perform at maximum efficiency and productivity.

  10. Make the plan accessible

    Sharing the project plan with team members not only allows clarity for everyone working on the project but it can produce a higher quality plan. It’s always better to have more than one pair of eyes on an important document as errors and inaccuracies can be better spotted and rectified.

Final Thoughts

How do you plan a project? If you have any project planning tips you feel will make the world of difference to someone else in a similar situation, go ahead and share them in the comment section below. 😊

Cheers,

Dinnie and the Zenkit Team

10 Project Planning Best Practices | Zenkit (6)

AsmoPublished on , updated on · 6 min read

FREE 20 MIN. CONSULTATION WITH A PROJECT MANAGEMENT EXPERT

Wanna see how to simplify your workflow with Zenkit in less than a day?

Book a Live Demo
  • Planning
  • Project Management
  • Project Planning
  • Teamwork
  • Zenkit Project Management

Leave a Reply

×

Zenkit Comment Policy

At Zenkit, we strive to post helpful, informative, and timely content. We want you to feel welcome to comment with your own thoughts, feedback, and critiques, however we do not welcome inappropriate or rude comments. We reserve the right to delete comments or ban users from commenting as needed to keep our comments section relevant and respectful.

What we encourage:

  • Smart, informed, and helpful comments that contribute to the topic. Funny commentary is also thoroughly encouraged.
  • Constructive criticism, either of the article itself or the ideas contained in it.
  • Found technical issues with the site? Send an email to [email protected] and specify the issue and what kind of device, operating system, and OS version you are using.
  • Noticed spam or inappropriate behaviour that we haven’t yet sorted out? Flag the comment or report the offending post to [email protected].

What we’d rather you avoid:

Rude or inappropriate comments

We welcome heated discourse, and we’re aware that some topics cover things people feel passionately about. We encourage you to voice your opinions, however in order for discussions to remain constructive, we ask that you remember to criticize ideas, not people.

Please avoid:

  • name-calling
  • ad hominem attacks
  • responding to a post’s tone instead of its actual content
  • knee-jerk contradiction

Comments that we find to be hateful, inflammatory, threatening, or harassing may be removed. This includes racist, gendered, ableist, ageist, hom*ophobic, and transphobic slurs and language of any sort. If you don’t have something nice to say about another user, don't say it. Treat others the way you’d like to be treated.

Trolling or generally unkind behaviour

If you’re just here to wreak havoc and have some fun, and you’re not contributing meaningfully to the discussions, we will take actions to remove you from the conversation. Please also avoid flagging or downvoting other users’ comments just because you disagree with them.

Spam

Every interpretation of spamming is prohibited. This means no unauthorized promotion of your own brand, product, or blog, unauthorized advertisem*nts, links to any kind of online gambling, malicious sites, or otherwise inappropriate material.

Comments that are irrelevant or that show you haven’t read the article

We know that some comments can veer into different topics at times, but remain related to the original topic. Be polite, and please avoid promoting off-topic commentary. Ditto avoid complaining we failed to mention certain topics when they were clearly covered in the piece. Make sure you read through the whole piece before saying your piece!

Breaches of privacy

This should really go without saying, but please do not post personal information that may be used by others for malicious purposes. Please also do not impersonate authors of this blog, or other commenters (that’s just weird).

Do you want to streamline your project management process?

Book a Live Demo

10 Project Planning Best Practices | Zenkit (2024)

FAQs

10 Project Planning Best Practices | Zenkit? ›

Key takeaways: Project planning is the process of constructing a comprehensive and detailed plan that outlines the necessary steps, resources, and timeline to achieve a project's objectives. It involves identifying the project's scope, setting goals, and establishing a budget.

What are the 7 steps to successful project planning? ›

Let's dive into the details:
  • Step 1: Define your goals and objectives. ...
  • Step 2: Set success metrics. ...
  • Step 3: Clarify stakeholders and roles. ...
  • Step 4: Set your budget. ...
  • Step 5: Align on milestones, deliverables, and project dependencies. ...
  • Step 6: Outline your timeline and schedule. ...
  • Step 7: Share your communication plan.
Feb 2, 2024

What is project planning practices? ›

Key takeaways: Project planning is the process of constructing a comprehensive and detailed plan that outlines the necessary steps, resources, and timeline to achieve a project's objectives. It involves identifying the project's scope, setting goals, and establishing a budget.

What are the 10 parts of a project plan? ›

Project Planning Essential Elements (With Infographic)
  • Outline business justification and stakeholder needs.
  • List of requirements and project objectives.
  • Project scope statement.
  • List of deliverables and estimated due dates.
  • Detailed project schedule.
  • Risk assessment and management plan.
  • Defined roles and responsibilities.
May 2, 2022

What are the 7 C's for project success? ›

The seven elements (7 C's) are: customers, competitors, capabilities, cost, channels, communication, and coordination.

What are the 9 steps in project planning? ›

Follow these steps to create your project plan:
  • Determine the project goals and objectives. ...
  • Determine the project scope. ...
  • Build your work breakdown structure (WBS) ...
  • Set timelines. ...
  • Determine and plan resources. ...
  • Estimate costs. ...
  • Determine risks and constraints. ...
  • Plan out communication.
Oct 25, 2022

What are the 8 steps involved in project planning? ›

You can get more information on the essentials of project planning with this project management training course.
  • Step 1: Initiation. ...
  • Step 2: Preparation. ...
  • Step 3: Planning And Design. ...
  • Step 4: Testing. ...
  • Step 5: Going “Live” ...
  • Step 6: Execution. ...
  • Step 7: Project Monitoring And Analysis. ...
  • Step 8: Project Close.

What is a best practice project? ›

A best practice is a technique, method, or process that is believed to be more efficient and effective in achieving a goal than any other techniques, methods and processes, when applied to a particular condition or circ*mstance.

What are the 10 steps of project management? ›

This paper will provide a high-level overview of the TenStep process and the purpose of the ten steps.
  • 1.0 Define the Work. ...
  • 2.0 Build the Schedule and Budget. ...
  • 3.0 Manage the Schedule and Budget. ...
  • 4.0 Manage Issues. ...
  • 5.0 Manage Scope. ...
  • 6.0 Manage Communication. ...
  • 7.0 Manage Risk. ...
  • 8.0 Manage HR.

What are the 7 stages of project planning? ›

The Project Lifecycle consists of seven phases intake, initiation, planning, product selection, execution, monitoring & control, and closure. These phases make up the path that takes your project from start to finish.

What are the 10 steps to plan an event? ›

Here's a list of 10 steps that may help you plan an event:
  1. Organize your objectives. ...
  2. Select a venue and date. ...
  3. Establish vendors, sponsors and partners. ...
  4. Plan the program and entertainment. ...
  5. Brand and market the event. ...
  6. Determine an event day schedule. ...
  7. Create success metrics.
Feb 13, 2024

What are the 10 project management processes that belong to the executing process group? ›

Processes in Executing Process Groups (10 Processes)
  • Direct and Manage Project Work ⇒ Project Integration Management. ...
  • Manage Project Knowledge (Project Integration Management) ...
  • Manage Quality ⇒ Project Quality Management. ...
  • Acquire Resource ⇒ Project Resource Management. ...
  • Develop Team (Project Resource Management)
Jan 30, 2024

Top Articles
What Is Mobile Device Management (MDM)? | Fortinet
Tkinter.Tclerror: Image "Pyimage3" Doesn'T Exist
Kem Minnick Playboy
Caesars Rewards Loyalty Program Review [Previously Total Rewards]
Repentance (2 Corinthians 7:10) – West Palm Beach church of Christ
Here are all the MTV VMA winners, even the awards they announced during the ads
Overnight Cleaner Jobs
Recent Obituaries Patriot Ledger
Melfme
craigslist: south coast jobs, apartments, for sale, services, community, and events
Irving Hac
Mndot Road Closures
Baseball-Reference Com
Zendaya Boob Job
What is the surrender charge on life insurance?
Erin Kate Dolan Twitter
Wunderground Huntington Beach
Used Drum Kits Ebay
Sivir Urf Runes
Dignity Nfuse
Heart and Vascular Clinic in Monticello - North Memorial Health
Tyrone Unblocked Games Bitlife
Pokemon Unbound Shiny Stone Location
Johnnie Walker Double Black Costco
Yog-Sothoth
John Chiv Words Worth
Mybiglots Net Associates
Bethel Eportal
What Is The Lineup For Nascar Race Today
8000 Cranberry Springs Drive Suite 2M600
Suspiciouswetspot
Hdmovie2 Sbs
Login.castlebranch.com
Basil Martusevich
Springfield.craigslist
Gr86 Forums
Sinfuldeeds Vietnamese Rmt
Ewwwww Gif
Main Street Station Coshocton Menu
Xxn Abbreviation List 2023
Guy Ritchie's The Covenant Showtimes Near Grand Theatres - Bismarck
Isabella Duan Ahn Stanford
Squalicum Family Medicine
Dontrell Nelson - 2016 - Football - University of Memphis Athletics
Movie Hax
Value Village Silver Spring Photos
Mail2World Sign Up
The top 10 takeaways from the Harris-Trump presidential debate
Mikayla Campinos Alive Or Dead
Definition of WMT
Latest Posts
Article information

Author: Clemencia Bogisich Ret

Last Updated:

Views: 6125

Rating: 5 / 5 (60 voted)

Reviews: 83% of readers found this page helpful

Author information

Name: Clemencia Bogisich Ret

Birthday: 2001-07-17

Address: Suite 794 53887 Geri Spring, West Cristentown, KY 54855

Phone: +5934435460663

Job: Central Hospitality Director

Hobby: Yoga, Electronics, Rafting, Lockpicking, Inline skating, Puzzles, scrapbook

Introduction: My name is Clemencia Bogisich Ret, I am a super, outstanding, graceful, friendly, vast, comfortable, agreeable person who loves writing and wants to share my knowledge and understanding with you.